Signal creates value

Model the link between towers and Bitcoin.

Explore a cellular-connected computing setup, its energy and network requirements, and a return estimate with every key assumption in view.

Planning model · no live tower telemetry

Cell tower above a mountain landscape at sunset

Same signals.
Brighter future.

01 / Configuration

Feasibility planner

Adjust the site profile and market assumptions to recalculate the model.

Site configuration

Planning inputs for the connected compute setup

02 / Modeled outcome

Estimated monthly profile

Illustrative

Planned compute units

1

200 TH/s combined

Hardware estimate

$4,500

One-time equipment cost

Electricity estimate

$287

2,394 kWh / month

Estimated Bitcoin

0.003463 BTC

$225 gross / month

Estimated monthly result after electricity

-$62/ month

No simple hardware payback in this estimate

This subtracts modeled electricity only. It does not include hardware depreciation, pool fees, cooling, connectivity charges, taxes, financing, or repairs.

03 / Network profile

A clear view of usage and capacity.

A planning estimate based on monthly data volume and the uplink capacity entered above. It does not read a carrier network or measure a tower connection.

Average data throughput fits the stated uplink

Projected network usage

30-day month

Estimated data transfer

20 GB / month

0.062 Mbps average per site

Average of entered uplink0.2%

Average throughput only; burst demand and radio conditions require field measurement.

04 / Return assumptions

Every estimate starts with an assumption.

Change the reference values below to see how the return estimate responds. Results are scenarios, not predictions or promised returns.

Model basis: 144 blocks per day, a 30-day month, your entered block reward and reference BTC price, and the availability percentage applied to both output and energy.

Network hashrate, reward, and price are user-editable reference assumptions. Actual difficulty, pool fees, block timing, uptime, transaction fees, and market price can change. No live market or mining-pool data is connected.

A measured approach

Infrastructure first. Algorithms next.

01Understand site power, connectivity, and operating constraints.

02Compare hardware and energy requirements against those limits.

03Evaluate the model before considering scale or deployment.